Our Projects

PDG has worked on a wide range of mining, petrochemical, commercial, industrial and building projects. Some examples of these projects are provided below;

WAITSIA PROJECT
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites
Project Work Volume: 600 tons of structural steel and platewwork. Major Assignment: Shop detailing services for structural, platewwork & miscellaneous steelwork for the Gas Processing modules for the Waitsia Gas Project Stage 2 Project.
Date: 2021/2022
PADDINGTON GOLD PROJECT
35km north of Kalgoorlie, remains the central hub for Norton’s gold processing operations in the Goldfields region.
Shop detailing services for plateworks, which consist of 14 various lined chutes & miscellaneous steelwork for the Paddington Gold Project.
Date: 2020/2021
WEST ANGELAS DEPOSITS C & D PROJECT
North West, WA
Shop detailing services for piping, platework & miscellaneous steelwork for the Primary and Secondary Crushing facilities, Conveyors, Transfer Station, Surge Bin facility and Low-level & Mid-level Conveyor modules for the Rio Tinto West Angelas Deposit C & D Project.
Date: 2019/2020
METRONET FORRESTFIELD AIRPORT LINK
Perth, WA
1200t of Structural steel shop detailing for the Forrestfield Airport Link project. The scope included the new Forestfield, Redcliffe and Airport Central train stations along with three Emergency Egress Shafts and Dive Portal buildings along the train route.
Date: 2018/2019
BHP POWDER LEACH PROJECT
Kwinana, WA
Shop detailing of 11 Nickel Sulphate Tanks
Date: 2018/2019
WOODSIDE PLUTO DFS PROJECT
NWA
Pipe support structural steel shop detailing
Date: 2018
YANDI 1 TRIPPER DISCHARGE CHUTE DETAILING
Yandi, WA
Tripper Discharge Chute detailing
Date: 2018
TIANQI LITHIUM PROJECT
Kwinana, WA
Shop detailing of 33 Stainless and 53 Carbon steel Tanks
Date: 2017/2018
TIANQI LITHIUM PROJECT
Kwinana, WA
3D piping modeling and shop detailing of 1,400 isometrics
Date: 2017/2018
SUNRISE DAM POWER STATION
Structural steel shop detailing
Structural steel shop detailing
Date: 2017
BIBBULUMN TRACK BRIDGE
South-West Australia
Structural steel shop detailing
Date: 2017
METH CARE AGED CENTRE
Como, WA
90T Structural steel shop detailing
Date: 2017
BELMONT FORUM SHOPPING CENTRE EXTENSION
Belmont, WA
180T of Structural steel shop detailing
Date: 2017
JUNDEE EXPANSION PROJECT
Structural steel shop detailing for Chutes
Structural steel shop detailing
Date: 2017
PERTH MINT ASSAY LAB
Perth Airport, WA
Structural steel shop detailing
Date: 2016
BHPB MAC WORKSHOP EXTENSION
North West WA
Structural steel and piping isometric shop detailing
Date: 2016
CHALLENGER TAFE – STAGE 2
Munster, WA
Structural steel shop detailing
Date: 2016
ROY HILL PROJECT

Produced structural steel shop drawings for more than 1000T of steel for the Roy Hill project.

North West WA
Produced structural steel shop drawings for more than 1000T of steel for the Roy Hill project.
Date: 2014
THE WIGGINS ISLAND COAL EXPORT TERMINAL (WICET)

Project work volume: More than 3000 Tons.
Major Assignment:

  • Carried out lift studies and transport analysis to determine lifting and sea fastening requirements for 550T surge bin
  • Designed lashing plan for the Galleries and all packaged steel.
Queensland
Performed lift studies and transport analysis to determine lifting and seafastening requirements for 550T surge bin
Date: 2014
AN3 PROJECT – NAAN3

Produced structural steel shop drawings for more than 700T of steel for the AN3 project.

Kwinana, WA
Produced structural steel shop drawings for more than 700T of steel for the AN3 project.
Date: 20012
DEVIL CREEK ONSHORE DEVELOPMENT PROJECT

Project Work Volume: 3,000 tons of structural steel (52 modules).

Major Assignment: Producing Piping and structural steel shop drawings for 24 modules having a total 1,400 tons of structural steel.

Karratha, WA
Structural and piping shop drawings for 24 modules having a total weight of 1400t of structural steel
Date: 2009
ALCAN GOVE THIRD STAGE EXPANSION – G3 PROJECT

ALCAN GOVE THIRD STAGE EXPANSION – G3 PROJECT

Project Work Volume: 22,000 tons of structural steel, 1,500,000 DBI of Piping.

Major Assignment: Producing more than 6,000 piping isometric drawings and 12,000 tons structural steel shop drawings including some tanks and material handling components.

Northern Territory, Australia
Structural steel, tanks & material handling detailing. Piping isometric drawings
Date: 2004 - 2007